Factory Operations Induction

Factory Operations Induction

In this course you will learn a brief overview of how the MAVERICK is built inside the MAVPOD, and what your potential factory setup will look like. Feel free to select full screen or download the material for best viewing.

Responsible Nick Avery
Last Update 28/06/2022
Completion Time 2 hours 58 minutes
Members 7
    • Google Translate Information (optional)
  • Introduction to 5B
    • 5B Maverick - safe, fast to deploy, powerful, cost effective
  • Operations Overview
    • OEM General Factory Requirements
    • Example MAVPOD Layout
    • MAVPOD Energy Requirements Per POD June 2022
  • Main Assembly Documents
    • 2020 MAV Assy Guidelines (For Information Only)
    • 2020 MAV ASSY Procedure (For Information Only)
  • Logistics
    • 5B's MAVERICK Solar Blocks Packed for Global Shipment by Assembly Partners IXL
    • Container Loading MAV's SOP
    • PUSHING JIG Drawing
    • PUSHING JIG Drawing (Imperial Units)
    • 5BMS-LOG-SOP001-AU008 - TRUCK LOADING OF NON-CONTAINERISED MAVERICKS